Architectural Design Studio Building design and BIM

Warehouse Conversion

Example project — point-cloud survey to coordinated model.

Project data

Client
Example Holdings
Location
Example City
Year
2023
Status
Design development
Type
Adaptive reuse — office
Site area
3400 m²
Gross floor area
2950 m²
Plot ratio
0.87
Storeys
2
Structure
Existing steel portal frame, new mezzanine
Software
Revit, ArchiCAD
Scope
  • Point-cloud to BIM
  • Existing-conditions model
  • MEP coordination

Example content. Adaptive-reuse work is mostly about what is already there, so the survey sheet leads and the existing-conditions model is listed as scope in its own right.

  1. S-001

    Survey control and scan positions

    Scale 1:500

    A1

  2. A-120

    Mezzanine plan

    Scale 1:100

    A1