Warehouse Conversion
Example project — point-cloud survey to coordinated model.
Project data
- Client
- Example Holdings
- Location
- Example City
- Year
- 2023
- Status
- Design development
- Type
- Adaptive reuse — office
- Site area
- 3400 m²
- Gross floor area
- 2950 m²
- Plot ratio
- 0.87
- Storeys
- 2
- Structure
- Existing steel portal frame, new mezzanine
- Software
- Revit, ArchiCAD
- Scope
-
- Point-cloud to BIM
- Existing-conditions model
- MEP coordination
Example content. Adaptive-reuse work is mostly about what is already there, so the survey sheet leads and the existing-conditions model is listed as scope in its own right.
Drawings
-
S-001 Drawing not published
S-001
Survey control and scan positions
Scale 1:500
A1
-
A-120 Drawing not published
A-120
Mezzanine plan
Scale 1:100
A1